Redirect Notice
 The previous page is sending you to https://www.alamy.com/mechanical-contracting-plumbing-january-december-1908-e-increase-ofthickness-for-a-greater-diameter-insideof-buildings-they-shall-not-be-coveredbut-shall-be-placed-as-required-by-theregulations-they-shall-have-a-suitabletrap-with-an-accessible-clean-out-plac-ed-either-inside-or-outside-the-founda-tions-of-the-walls-of-the-building-theyshall-have-an-air-or-vent-pipe-of-suit-able-size-and-position-the-soil-pipe-shall-have-a-continuous-plumber-and-steamfitter-june-7-iqiks-fall-and-should-be-run-along-the-cellarwall-if-possible-soil-pipes-shall-besecurely-ironed-to-walls-or-suspended-image339453105.html.

 If you do not want to visit that page, you can return to the previous page.